WEALTHCONS - PROUDLY OVERCOMING ALL CHALLENGES PROJECT WITH BASEMENT IN HO CHI MINH CITY

15.07.2023

In the narrow space and complex geology of the city center, WEALTHCONS confidently conquers hotel projects, office buildings with challenging basements.  These projects not only require professionalism but also flexibility when executing in the city center.

1. Let's review 3 projects that WEALTHCONS have been implemented the basement in the heart of Ho Chi Minh City:

 4-star hotel project CAPTION BY HYATT BASON SAIGON in District 1:

Scale of 3 basements and 22 floors

Method of tunnel construction with a depth of nearly 20m: Semi-Topdown

2. HN TOWER BUILDING project in Phu Nhuan District:

Scale 2 basements and 11 floors; geology with high groundwater, flowing sand

Construction method with a tunnel depth of nearly 10m: Bottom - Up (Protecting the excavation pit with fin piles combined with anti-shaped steel splashes)

3. OFFICE BUILDING project in District 3:

Scale: 1 basement and 7 floors

Construction method: Digging Open Tunnel Combined with Anti-Slip System

Let's follow the journey of Building Prosperity of WEALTHCONS for more information!